A quick up date on the carpark.
Never enough hours in the day so there was some movement but as always not as much as I would have liked.
It takes two days per coat of paint so there goes a lot of the time.
The frame has been made and some castors put on the legs to move it around.Not in these pics.
The lights are in place,so we are getting there.
The idea with the lighting was to get the flicker effect that you get in a carpark as you move through as opposed to having the whole thing lit up.
I cut the LEDs into random sized pieces and joined them with random lengths of wire to get the uneven lighting effect of a carpark.
Seems to work OK. next trip home it should be finished.
Hang on thats what I said last time.
Looks like the walls will come into play when in the outside lane as there was a change in design.
We will see how it runs in practical terms soon I hope.