The basic layout will give me a continuous loop track of just at 80 ft. the rise will not be a crown shredder, as it will only rise about four feet of the deck, that is at 28" off the floor. The overall layout will take up a full 4x8 sheet, and have a loop at the top, and one at the bottom. I have a Slotdragon timing system left over from a previous project, and plan on using it to get total timed runs from bottom to top and back to the bottom again. It will be fully landscaped, and set up primarily for smaller sports and rally cars. plenty of sliding room in the corners, and just enough wiggles and bends to keep it fun.
Hopefully, with the upcoming long weekend, I will be doing some test runs at least!
So stick around if your interested, and I wll keep adding some pictures and such, and who knows, maybe some of you would like to conquer the Dragon yourselves!
