This is my first post since joining the forum.
Spent two weeks on one of these;

To visit places like this;


But now it is time to get back to reality and finish cementing the bricks to the top of the concrete blocks.

Also have to recoat the deck for winter and then get to finish and use the following:





It is about 70 feet per lap. Has Pyramid 22 amp supply, copper tape and 25 ohm Parma controllers. Need to finish the outside of the table and the pit area. Was supposed to have more curves but the Boss said it would be too hard. There are no sweeping fast corners and the sliding area after getting into the turns goes away fast, so you have to drive, not just power through.
Joseph